Operations & Support

A plant that runs perfectly for a year and then fouls, drifts, or trips in week 53 is not a working plant. Petro Sep stays involved beyond commissioning: continuous remote monitoring, scheduled maintenance, membrane and equipment care, and on-call response. Some customers run their systems entirely with our team; others use us as backup to in-house operations. Both work, on fabrication-led plants and membrane-led systems alike.

What you get at this step

The deliverable.

At the end of operations & support, here is what changes for your project.

Uptime, contracted
98%+
On systems where we run operations end to end.
Membrane life, achieved
3 to 5 years
On real industrial feeds, with proper CIP and care.
Optimization gains
Most operations contracts deliver an additional 5 to 15% efficiency improvement in year 2 vs commissioning baseline. The savings often cover the operations contract.

Capabilities and equipment

What we bring.
What we own.

We do not subcontract this step. The capabilities and equipment below are in-house, and they show up on your project.

AZEO-SEP hybrid separation system operating at the Virginia refinery.

01

Remote monitoring (24/7)

SCADA telemetry to our operations center. Our engineers see drift, fouling, and trip events the same time your operators do, often sooner.

Ultrafiltration membrane modules at an installed treatment system.

02

Scheduled CIP and membrane care

Cleaning regimes tuned to your specific fouling profile. Membrane replacement scheduled by performance, not calendar.

Installed separation system at the Virginia hybrid refinery.

03

On-call response

Phone or video support within 2 hours, on-site response within 48 hours for critical issues. Service level agreement scoped per contract.

Ultrafiltration membrane treatment system in operation.

04

Performance reporting

Monthly performance reports, quarterly review meetings, annual optimization audits. Continuous improvement is part of the contract, not an extra.